Saturday 26 September 2015

Sileby Mill



Here I am Rune
Distance 6.5 miles
Total 1459 Locks 72 Tunnels
Running total mileage 2093.5 miles 

Back on the move today and we have gone as far as Sileby Lock, although the original intention was to only go as far as Mountsorrel Lock but there was nowhere to moor there. The river/canal is getting quite busy, this was apparent before we set off since quite a few boats came past whilst we were moored in Loughborough. As we went through Barrow on Soar we stopped off for water and to empty the cassette. There are a lot of small boats around that area all being hired from Barrow boats. They seemed to all be having fun although I did have to push past a group on pedolos who were taking selfies at the top of a weir, with the best will in the world I don’t tend to want to mess around at the top of a weir!

Tomorrow we haven’t decided what the cunning plan is, whether to press on towards Leicester or to stay here and visit Mountsorrel where the crew wants to visit another churchyard, I suspect it will be the latter.

No comments:

Post a Comment