Here I am Rune
Distance 7.6 miles
Total 1130 Locks 59 Tunnels
Running total mileage 1520.3 miles
Reached the ‘target’ of Anderton after a fairly uneventful
day, no locks on the stretch from ‘Bramble Cuttings’ to here so little for the
crew to do. The only factor making steering more difficult than necessary was
the wind as it has been yet another windy day today. Have made use of the
facilities at the Anderton Sanitary Station upon arrival (dumped rubbish, emptied
cassettes and filled up with water) so we are ready to go down onto the Weaver
Navigation tomorrow for a bit of river cruising. Still haven’t had any contact
from CRT as to whether my booking to get into Liverpool has gone through so
will need to give them a ring tomorrow (office not open on Tuesdays). Should be
able to include some photos of the Anderton Boat Lift tomorrow as well.
No comments:
Post a Comment